Skip to main content
Netherlands News in English

Main navigation

  • Top stories
  • Health
  • Crime
  • Politics
  • Business
  • Tech
  • Culture
  • Sports
  • Weird
  • 1-1-2
Image
The Galecopper Bridge over the Amsterdam Rijnkanaal on the A12 in Utrecht
The Galecopper Bridge over the Amsterdam Rijnkanaal on the A12 in Utrecht - Credit: Photo: Rijkswaterstaat/Wikimedia Commons
Business
traffic
rush hour
Rijkswaterstaat
ANWB
Galecopper Bridge
road works
A12
Utrecht
Friday, 27 September 2019 - 07:33

Share this article:

Roadworks on A12 highway: traffic starts piling up

Road works on the Galecopper Bridge will cause traffic problems on the A12 around Utrecht for the coming month, Rijkswaterstaat expects. The work on the bridge started on Thursday night and means that fewer lanes are open on the A12 towards Arnhem. Traffic jams started piling up early on Friday morning, according to travelers' association ANWB.

Just before 7:00 a.m. the ANWB reported the first traffic jams related to these road works. Traffic was piling up on the A12 from Harmelen and on the A2 from Nieuwegein.

Public works department Rijkswaterstaat will try to redirect traffic as much as possible, but warns that commuters should take extra travel time of at least 30 minutes into account. Road users are advised to use online navigation tools like Google Maps to pick the best route. "We work together with, for example, Google. The current situation is included in their navigation. You see how busy it is when you drive and the route is adjusted accordingly", a Rijkswaterstaat spokesperson said to RTV Utrecht.

The joints of the Galecopper Bridge - the steel connections between the bridge and the road surface - need to be replaced, according to NOS. When the bridge was renovated three years ago, these joints were put under extra pressure which weakened them. Road workers will work on the bridge 24 hours a day, seven days a week to get the work done as quickly as possible. Rijkswaterstaat is also trying to limit the noise as much as possible by switching tools for quieter alternatives.

The reason that the work was not done during the quiet summer months, was that there was already major road works on the A2 highway between Utrecht and Amsterdam during the summer, Rijkswaterstaat said to NOS. Adding work to the Galecopper Bridge on top of that would have been too radical for traffic. It also cannot wait until after the winter.

Rijkswaterstaat hopes to have the work on the bridge done by November 8th at the latest.

More like this

Image
Traffic on the A2 from Den Bosch toward Utrecht, 26 August 2024
Traffic jams expected as more schools reopen after summer vacation
Image
A9 highway closed between the Badhoevedorp and Holendrecht junctions for roadworks on the Schiphol Bridge, 17 June 2024
A9 highway closed at Schiphol bridge through morning rush hour; Expect delays
Image
The Oudenrijn junction on the A12 between The Hague and Utrecht
Worst traffic jam ever expected on A12 today; Already 40 minutes of delay
Image
Rijkswaterstaat performing roadworks on a highway
Roadworks to cause massive traffic issues in Utrecht region this and next weekend
Make NL Times your top Google source

Follow us:

Latest stories

  • Record 38 players from Dutch clubs set for expanded World Cup
  • Wasteful Oranje punished as Algeria snatch late victory in World Cup warm-up
  • Dutch State buys medieval ring found with metal detector for €83,150
  • Rotterdam shooting suspect arrested in Spain within days of fleeing
  • Nearly 90% of Dutch dermatologists link TikTok skincare trends to patient skin problems

Top stories

  • Court rules Ye can remain in Netherlands for Arnhem performances this week
  • New A'dam coalition planning parking +tourist tax hike, free public transport for kids
  • European Commission tells Netherlands to stop extra border controls
  • Pregnant woman thrown to ground at Zeist asylum shelter was trying to ask cop a question
  • Senior Dutch virologist, colleague accused of smuggling inactive Mpox into United States

© 2012-2026, NL Times, All rights reserved.

Footer menu

  • Change Privacy Settings
  • Privacy Policy
  • Contact
  • Partner Content