Skip to main content
Netherlands News in English

Main navigation

  • Top stories
  • Health
  • Crime
  • Politics
  • Business
  • Tech
  • Culture
  • Sports
  • Weird
  • 1-1-2
Image
Shipping traffic on the IJ at Amsterdam Centraal
Shipping traffic on the IJ at Amsterdam Centraal - Credit: Photo: nilaya/DepositPhotos
Business
Amsterdam
Ij
bicycle tunnel
bicycle bridge
Cora van Nieuwenhuizen
Amsterdam Noord
Java island
Java Bridge
Ministry of Infrastructure and Water Management
Tuesday, 11 June 2019 - 15:40

Share this article:

Opens in a new window Opens in a new window Opens in a new window Opens in a new window Opens in a new window Opens in a new window

New bridge over, not tunnel under, Amsterdam's IJ increasingly likely

It seems increasingly likely that a new cycling bridge will be built over the IJ river in Amsterdam, instead of a tunnel under it. Research by the Ministry of Infrastructure showed that raising the existing bridges over the river higher will cost unaffordable amounts of money, which eliminates the need to build the new bridge extra high - the main argument for building a tunnel instead.

The city of Amsterdam is in favor of building a cycling bridge as a "fixed bank connection" to Amsterdam Noord, because the construction of a tunnel is more expensive, Het Parool reports. The only way in which a tunnel would be cheaper than a bridge, is if one of the two tubes of the existing IJ tunnel is designated a cycling tunnel. But this would mean that there will be two-way car traffic in the other tube of the tunnel, which is in violation of the regulations for tunnels.

The main obstacle in the years-long discussion about building a new bridge over the IJ was its height - the bridge must be high enough for shipping traffic to pass underneath, according to Het Parool. Amsterdam wants the bridge at 9.10 meters high - the same height as most other bridges on the shipping route. Public works department Rijkswaterstaat, the Ministry of Infrastructure, and the maritime industry want the bridge built at east 11.35 meters high.

Building the bridge higher than 9.10 meters would make it impractical for the cyclists who are meant to use it. They will have to battle through a steeper incline, especially since there is hardly any room on the densely built Amsterdam ramparts to make the run-up longer. Many, including the previous Infrastructure Minister Mealnie Schultz van Haegen, therefore supported rather building a tunnel under the IJ.

Building the bridge at 11.35 meters height only makes sense if the other bridges on the shipping routes around Amsterdam are also raised to this height. Otherwise ships too tall for the 9.10 meter high bridges won't be able to reach the new bridge in any case. Last week Minister Cora van Nieuwenhuizen of Infrastructure and Water Management sent a letter to parliament stating that an extensive cost-benefit analysis shows that raising the other bridges that span the IJ is practically unaffordable.

This means that the new bridge can be built at the same height as the other bridges on the shipping routes.

More like this

Image
A GVB Ferry crossing the IJ River between Azartplein in Amsterdam-Oost and Zamenhofstraat in Amsterdam-Noord. 7 Aug. 2023
Amsterdam secures funding for IJ River bicycle bridge between Oost and Noord
Image
A cyclist drives past parked microcars in Amsterdam.
Nearly half of microcar drivers in Amsterdam don't know the traffic rules
Image
Traffic sign informing people of the fatbike ban in the Vondelpark in Amsterdam
Amsterdam fines 39 fatbike ban violators; Police begin campaign in Barendrecht
Image
A metro train on the Noord-Zuid line at Noord metro station in Amsterdam, 22 July 2018
Budget for extending Amsterdam Noord-Zuid metro line to Schiphol up to €6 billion short
Make NL Times your top Google source

Follow us:

Latest stories

  • More bulk machines that can process dozens of deposit bottles, cans placed in NL
  • Anonymous illegal fireworks reports in the Netherlands surge 57% in first half of year
  • Turkish President gifts revolvers, but Rutte rejects his and Jetten leaves his behind
  • Aviation groups consider new alcohol rules after rise in drunken passenger disturbances
  • Former police officer and friend acquitted of raping drunk teen girl; Prosecutors appeal

Top stories

  • Dutch home price increases leveling off; Up 2.4% year-on-year to record €506,000: NVM
  • Fire destroys multiple holiday homes on beach in Velsen-Noord; One hurt
  • WorldPride starts with unveiling of permanent Walk of Pride monument through Amsterdam
  • Amsterdam tech company Mews cuts 15 percent of jobs to drive AI
  • People in their 30s, 40s most frustrated by work; Third consider their job meaningless

© 2012-2026, NL Times, All rights reserved.

Footer menu

  • Change Privacy Settings
  • Privacy Policy
  • Contact
  • Partner Content