Skip to main content
Netherlands News in English

Main navigation

  • Top stories
  • Health
  • Crime
  • Politics
  • Business
  • Tech
  • Culture
  • Sports
  • Weird
  • 1-1-2
Image
The Demkabrug and Werkspoorbrug, two bridges in Utrecht that cross the Amsterdam-Rhine Canal. 2018
The Demkabrug and Werkspoorbrug, two bridges in Utrecht that cross the Amsterdam-Rhine Canal. 2018 - Credit: cakifoto / DepositPhotos - License: DepositPhotos
Business
Utrecht
Schiphol Airport
Amsterdam
Rotterdam
Almere
Alkmaar
Driebergen
Zeist
Uitgeest
NS
staff shortage
adjusted train schedules
train
Friday, 10 June 2022 - 20:45

Share this article:

NS running fewer trains on Saturday due to staff shortage

Dutch rail operator NS said it will reduce service on several routes on Saturday afternoon. The national train firm said Friday night that it will be affected by "a shortage of available staff," causing the need to adjust the timetable.

The Utrecht region will be hardest hit by the changes. Fewer trains will run on three Intercity services connecting Utrecht Centraal with Schiphol Airport, Alkmaar, and Rotterdam Centraal. Additionally, the Sprinter between Utrecht Centraal and Almere Centrum will be reduced, as will the Sprinter connecting Driebergen-Zeist with Uitgeest. Staff shortages hindered service in the Randstad area last weekend.

Last month, Infrastructure State Secretary Vivianne Heijnen warned that the NS could be battling the staff shortage issue through the summer. It is trying to recruit conductors, drivers, and many other roles needed to keep the trains running. "The prospects are not rosy, which means that NS may have to take more measures this summer and can be hindered in the intended growth," she told the Tweede Kamer.

Starting on Monday, the train route linking Nijmegen and Rotterdam with stops in Arnhem, Utrecht, and Schiphol, will be reduced. Instead of six trains running hourly, four will run most hours.

More like this

Image
A NS train leaves Amsterdam Centraal headed east on a hot Tuesday afternoon. 23 June 2026
NS cancelling trains on key routes this week due to heat; Passengers will need water
Image
Snow falls on the A4 along the southern edge of Schiphol Airport, near Amsterdam and Badhoevedorp. 15 Feb. 2026
Some 575 flights cancelled, delayed at Schiphol amid snow; 50 more affected tomorrow
Image
Empty rails at Amsterdam Central Station due to rail works and switch issues decreasing train traffic to Utrecht, 4 February 2026
Malfunction halts train traffic to Schiphol; Many train issues in Netherlands today
Image
An NS train at Amsterdam Zuid station
Schiphol train issues to last all morning; Also impacting trains to Utrecht, Rotterdam
Make NL Times your top Google source

Follow us:

Latest stories

  • Survey: Dutch travelers shift back toward air travel as car and train use decline
  • Dutch Supreme Court rules against automatic refunds for illegal online gambling losses
  • Dutch coronavirus inquiry witnesses targeted by physical and online threats
  • Amsterdam tests GPS device that warns victims when suspects are nearby
  • Small business owners earn less than freelancers as profits fall in the Netherlands

Top stories

  • Dutch State gave Philip Morris over €1 million to subsidize carbon improvements
  • Hundreds of serious crime convicts handed shorter sentences because trials take too long
  • Victim resuscitated on Rotterdam street after shooting; 5 suspects arrested
  • Societal change behind increase in euthanasia; Doctors experience more pressure
  • Dutch housing market cools off: Fewer mortgage applications, higher  interest rates

© 2012-2026, NL Times, All rights reserved.

Footer menu

  • Change Privacy Settings
  • Privacy Policy
  • Contact
  • Partner Content