Skip to main content
Netherlands News in English

Main navigation

  • Top stories
  • Health
  • Crime
  • Politics
  • Business
  • Tech
  • Culture
  • Sports
  • Weird
  • 1-1-2
Image
Power lines at sunset
Power lines at sunset - Credit: brianguest / DepositPhotos - License: DepositPhotos
Business
Sophie Hermans
power grid
grid congestion
Ministry of Climate and Energy
Monday, 6 October 2025 - 11:10

Share this article:

Over 14,000 businesses on waiting list to connect to congested power grid

Finding space for businesses on the overcrowded electricity grid is still proving difficult. The waiting list has grown from 12,000 to 14,000 businesses in just a few months, according to caretaker Climate and Energy Minister Sophie Hermans (VVD) in a statement to parliament. She wants to meet with grid operators and the business community. “There are no easy solutions anymore.”

Hermans had pinned her hopes on the flexibility of businesses that consume less during peak periods, thus freeing up space for others. This would allow for the better utilization of existing grid capacity, as long as the necessary expansion and reinforcement of the electricity grid have not yet been implemented.

But this approach “is not yet sufficiently implemented in practice,” the Minister now acknowledged. Grid operators are struggling to entice large consumers to participate. To make this measure truly successful, cooperation is also needed from businesses that are currently not affected by the grid congestion.

The power companies are already using gas generators to generate electricity at peak times in areas with significant capacity constraints. “Fossil fuel generation using gas is not a future-proof solution,” Hermans conceded. But according to the Minister, it could be a necessary step towards an economy in which companies transition away from fossil fuels.

Furthermore, the existing grid is being investigated for increased load. Grid operators are looking into whether this can be done without compromising reliability. The initial results are expected next month, with the final report expected early next year.

Reporting by ANP

More like this

Image
Utrecht
Grid operator warns overload in Utrecht, Gelderland, Flevoland could stop new homes
Image
Battery facility for storing renewable energy
Number of massive batteries for energy storing rising rapidly in Netherlands
Image
Power lines at sunset
Jammed power grid, energy transition will cost Netherlands €195 billion: report
Image
Power lines at sunset
Business leaders call on Cabinet to fix power grid congestion
Make NL Times your top Google source

Follow us:

Latest stories

  • Man who held hostages in Ede, Vught moved to Groningen psychiatric clinic
  • Rotterdam-based chip inspection technology firm raises €331 million in deeptech funding
  • PostNL removes 800 mailboxes as Dutch mail reliability stays below legal standard
  • PRO, VVD, D66, Volt, and CDA strike deal to govern Rotterdam
  • Drug activity overruns Den Helder neighborhood, dealers take over at-risk locals’ homes

Top stories

  • Heat wave: Code Orange weather alert for 36°C temps takes effect on Wednesday
  • More international students facing housing issues in Netherlands, from bedbugs to fraud
  • Woman, 42, drowns in Waal after rescuing children from water
  • Average Netherlands home price rose by 4.4% to €487,383 in May
  • Video: Explosion damages Amsterdam-Oost apartment building; Two teens on fatbike sought

© 2012-2026, NL Times, All rights reserved.

Footer menu

  • Change Privacy Settings
  • Privacy Policy
  • Contact
  • Partner Content